How to Install Shaker Screen for Shale Shaker?

Shaker Screen

Shale screen and Shale shaker are critical in the drilling process. Despite this, the shaker screens are delicate and prone to damage by drilling solids which occasionally break them. Having equipment that meets the industry standards and maintaining it well is inescapable.

What use is there in having a good equipment that you cannot install? Due to the crucial role they play in the solid control process, understanding how to install the shaker screen is critical.

shaker screen
shaker screen

Perhaps when you first purchased, the screen was already installed in the equipment. However, because the screen is fragile and gets damaged in the course of working, it requires occasional replacement and re-installation. The steps outlined below have been incorporated with general observances that equipment users are familiar with. They will guide you about how to install a shaker screen.
i.    As soon as it is damaged shut down the equipment, close the feeder and provide tag.
ii.    Use your hands or appropriate tools to uninstall the screen.
iii.    Clean the screens in the drilling mud using water.
iv.    Transfer drilling solids from the shale shaker by using the centrifugal sand pump and the shear pump to cut the drilling solids into smaller sizes to ease transportation.
v.    Extract the screen from the equipment.
vi.    Put the screen carefully on the table. Tighten the screen carefully using screws. For multiple-layered screens go, through the process again for each of the layers of screen.
vii.    Bolt the screen on the side with the locating bar with the cuttings outfall on the outside and plug it into the generator trailer.

Your shaker screen is now installed and you are ready to resume work. Remember that much as it is imperative for the user to know how to install the screen, choosing the screen that meets industry standards is as paramount.